Defining the site
The first issue to address in truss construction is the site. In contrast to indoors, outdoor truss construction requires attention to the levelness of the ground and the presence of large crowds in the event space. The equipment and parts required for the installation process need to be prepared in advance. It is worth noting that the main consideration for the installation of lighting trusses is the incorporation of stage effects.
Basic installation steps
Clear the site according to the size of the installation required. Measure and mark the position of the column with a ruler and connect the base to the counter head. After placing the set base on the fixed column position, attach the crossbeam. Once connected, orient the square sleeve and connect the crossbeams so that the whole frame is formed on the ground. The next step is to attach the uprights.
Ensuring the work progresses
When installing the lighting truss, we need to monitor the construction at all times. The surveying work should be followed up in a timely manner with follow-up measurements to observe the settlement of the tyre frame and load-bearing scaffolding in time to ensure the quality of the assembly of the trusses.
The above is all the information about assemble lighting truss correctly. When welding and assembling, we must pay attention to the order of grouping and the order of welding, and strictly execute the process. For any kind of joist, the first thing that needs to be done is to install the base, and then gradually connect and assemble the components.